Ridley First Phase

  • concrete pour   more concrete work  the slab   block work  wish we had a pumper truck that coudl
drive   frame up, this phase had siding  Framed and siding started   siding and handrails  sided and roofed   stained  the flooring   the flooring and walls   kitchen  kitchen

The Ridleys home was phase one of a two phase project and was a siding project to save a little money to spend on the main house and main house kitchen.  Floors were australian cypress, cabinets were custom hickory, new rough texture corian countertops.  Project took aproxmately 5 months with a 3 week delay due to weather and supply delays.

 

Steven Herston, Cedar Bluff, Alabama

  • last log goes inview from aboveinterior framedroof framing going up Herston home
  • Mr, Herston is out first ever deaf customer and he is building a beautiful little log home on a privite 2 acre lake in Cedar Bluff, Alabama

Larry and Tammie Akins

  • the ground is broken  footers being finished, concrete walls going up Concrete forms Septic system Plumbing up the walls log walls up and trees set Flatning out the bottom of the tree Fireplace trees View form down the hill Bracing off the tree well trees from the bottom of the hill setting porch post roof system and porches on, view form the bottom of the hill the back porch roof system
  • Larry and Tammy Akin, and their son Tyler, are towering over the Sequatchie valley and if the supply companies cooperate we will have them in their home by late August.
  •  

 